Fast-Track Kitchen Renovation London: How We Complete Projects in 7-10 Days

When clients first hear that we can complete a full kitchen renovation in seven to ten days, the response is almost always the same: a raised eyebrow, a moment of scepticism, and then the inevitable question—"But surely you're cutting corners?" It's a fair concern. After all, most Londoners have heard horror stories of kitchen projects that stretched from weeks into months, transforming homes into building sites and daily routines into logistical nightmares. At All Things Considered, we've spent over a decade proving that speed and quality aren't mutually exclusive. In fact, when done properly, a fast kitchen renovation in London isn't about rushing—it's about meticulous planning, seamless coordination, and minimising the disruption to your life.
For homeowners across Kensington, Chelsea, Westminster, and Notting Hill, time is often the most precious commodity. Whether you're a busy professional, a family with young children, or a property developer preparing a home for sale, the thought of living without a functioning kitchen for weeks on end is simply unacceptable. This is precisely why we developed our rapid renovation approach—not as a compromise, but as a better way of delivering exceptional results.
Why Traditional Kitchen Renovations Take So Long
To understand how we achieve quick kitchen refit timelines in London, it's worth examining why conventional approaches take so long. The traditional model operates on what we call "sequential scheduling"—each trade arrives after the previous one finishes, with gaps between for drying times, inspections, and the inevitable coordination failures. Your electrician completes their first fix, then you wait for the plasterer. The plasterer finishes, then you wait for the plumber's return. Each delay cascades into the next, and before you know it, a project quoted at three weeks has stretched to eight.
This approach persists because it's simpler for contractors to manage. They can juggle multiple projects simultaneously, moving tradespeople between sites as their schedules allow. The result? Your kitchen renovation fits around their convenience, not yours. We took a fundamentally different view. When Wale, our Head of Construction, established our rapid renovation methodology, he started from a simple premise: what if we designed the entire process around minimising the time a client spends without their kitchen?
The All Things Considered Approach to Rapid Kitchen Renovation
Our seven to ten day kitchen renovation process begins long before any tools arrive at your property. The foundation of speed is preparation, and we invest considerably more time in the planning phase than most contractors would consider necessary. This front-loaded approach means that when work begins, every element proceeds without hesitation.
Pre-Project Planning: The Hidden Work That Makes Speed Possible
Approximately four to six weeks before your renovation start date, our team conducts a comprehensive site survey. For properties in conservation areas—and in neighbourhoods like Kensington and Chelsea, that's most of them—we verify any permissions or restrictions that might affect the work. Victorian and Georgian townhouses present particular considerations: original features that warrant preservation, period-appropriate design choices, and structural elements that require careful handling.
During this phase, we finalise every specification down to the smallest detail. Cabinetry dimensions are confirmed to the millimetre. Appliance delivery dates are locked in. Tile quantities are calculated with appropriate contingency. Worktop templates are created and sent for fabrication. By the time our team arrives on day one, there are no decisions left to make, no materials to source, and no surprises waiting to derail the schedule.
"The clients who benefit most from our rapid approach are often those who initially doubted it was possible. They've been burned before by projects that overran, and they've learned to be sceptical. When we complete their kitchen in nine days, exactly as promised, they understand what proper planning actually looks like."— Wale, Head of Construction, All Things Considered
Day-by-Day: What Actually Happens During a 7-10 Day Kitchen Renovation
While every project has its unique requirements, particularly when working with period properties, our rapid kitchen renovation typically follows a carefully orchestrated sequence. Understanding this timeline helps clients appreciate both what's involved and why it works.
Typical 7-10 Day Kitchen Renovation Timeline
Day 1 - Complete strip-out of existing kitchen, including units, appliances, flooring, and wall finishes. Electrical and plumbing first-fix begins.
Day 2 - Electrical and plumbing rough-in completed. Any plastering or wall preparation work undertaken. Floor preparation begins.
Day 3 - Flooring installation. Wall tiling commences. Base unit installation begins in afternoon.
Days 4-5 - Full unit installation including wall cabinets. Integrated appliances fitted. Worktop templating confirmed.
Days 6-7 - Worktop installation. Sink and tap fitting. Splashback tiling completed. Electrical second-fix.
Days 8-10 - Final appliance connections. Painting and decorating. Snagging and quality inspection. Professional clean and handover.
The key to this timeline is parallel working. Rather than waiting for each trade to complete sequentially, our teams work simultaneously where safe and practical to do so. While the electrician completes wiring in one section, the plumber works in another. As flooring cures in the main space, tiling progresses on the walls. This coordinated approach requires exceptional communication between trades—something only possible because our core team has worked together for years and understands exactly how to integrate their activities.
Quality Assurance in Rapid Renovation: Addressing the Scepticism
The most common concern we hear from prospective clients is whether speed compromises quality. It's an understandable worry, particularly for homeowners investing significantly in their properties. The short answer is no—but the explanation deserves more detail.
Speed in our context doesn't mean hurrying. It means eliminating waste. The wasted days waiting for materials that should have been ordered earlier. The wasted time coordinating trades who weren't briefed properly. The wasted effort correcting mistakes that proper planning would have prevented. When you remove this waste, what remains is focused, efficient work performed by skilled craftspeople who know exactly what they're doing.
We maintain quality through several specific mechanisms. Every project includes a dedicated project manager who remains on-site throughout the renovation—not visiting occasionally, but present continuously to ensure standards are maintained and any issues are addressed immediately. Our materials are sourced from established suppliers with proven track records; we don't economise by using inferior products that might save money initially but cause problems later. And our final inspection process is thorough, covering everything from cabinet alignment to grout consistency to appliance function.
Working with Victorian and Georgian Properties
Many of our clients own period properties in areas like Notting Hill, Belgravia, and South Kensington—homes with original features, listed status considerations, and the structural idiosyncrasies that come with buildings constructed over a century ago. These properties require particular expertise that not all contractors possess.
Our experience with Victorian and Georgian homes means we anticipate the challenges before they arise. We know that walls in these properties are rarely perfectly straight or plumb, requiring careful adjustment of modern cabinetry for a seamless fit. We understand that original cornicing and ceiling roses warrant protection during work, and we take appropriate precautions. We're familiar with the planning sensitivities in conservation areas and ensure our work respects both the letter and spirit of local requirements.
This expertise doesn't slow us down—quite the opposite. Because we've encountered these situations hundreds of times, we handle them efficiently rather than treating each as a novel problem requiring improvised solutions.
The True Cost of Extended Kitchen Renovations
When comparing our rapid renovation service to traditional approaches, some clients focus initially on the quoted price. What they often overlook is the true cost of a prolonged project. Consider the financial and practical implications of a kitchen renovation that extends to six or eight weeks versus our seven to ten day timeline.
There's the direct cost of eating out or ordering takeaway meals for weeks on end—for a family of four in central London, this easily reaches several hundred pounds weekly. There's the productivity cost if you work from home and find your concentration constantly disrupted by noise, dust, and the presence of contractors. There's the stress cost, harder to quantify but very real, of living in what feels like a building site rather than a home. And for property developers or landlords, there's the opportunity cost of extended void periods when a property could be generating rental income or ready for sale.
Our clients frequently tell us that the minimal disruption kitchen renovation approach pays for itself through these avoided costs, quite apart from the value of simply having their home back sooner.
What Our Rapid Renovation Service Includes
To provide complete clarity on what clients can expect, our kitchen renovation service encompasses all standard elements of a comprehensive refit. This includes complete removal and disposal of existing units, appliances, and finishes; all necessary electrical work including new circuits, socket installations, and lighting; plumbing modifications for sink repositioning, dishwasher connections, and boiling water taps; flooring installation across the full kitchen area; wall preparation, tiling, and splashback installation; fitting of new units, worktops, and integrated appliances; decoration including painting and final finishes; and thorough cleaning before handover.
What we don't include—because it would compromise our timeline—is major structural work such as wall removal, significant extensions, or changes that require building control approval. These projects absolutely can be completed to high standards, but they require a different approach and realistic timelines. We're always honest with clients about what's achievable within our rapid framework and what would benefit from a more extended schedule.
Getting Started: The Process for Your Fast Kitchen Renovation
For homeowners interested in our rapid kitchen renovation service, the process begins with an initial consultation at your property. This allows us to assess the existing space, understand your requirements, and confirm that your project is suitable for our accelerated approach. We'll discuss design preferences, budget parameters, and your ideal timeline.
Following this consultation, we provide a detailed quotation covering all aspects of the work. Unlike some contractors, we don't offer artificially low initial quotes that inflate once work begins—our pricing is comprehensive and fixed, barring genuinely unforeseeable circumstances. Once you're ready to proceed, we agree a start date and begin the planning phase that makes our rapid execution possible.
Throughout this process, you'll have direct communication with Wale and our project management team. We believe that responsive, transparent communication is essential to client confidence, particularly when promising the kind of timeline we deliver.
Why London Homeowners Choose Speed Without Compromise
The demand for fast kitchen renovation in London continues to grow, driven by homeowners who refuse to accept that quality requires extended disruption. Our clients include professionals whose demanding careers leave little tolerance for household chaos; families who need their homes functioning normally for children's routines; property investors who understand that time directly affects returns; and downsizers and upsizers navigating tight chains where delays have cascading consequences.
What unites these clients is an appreciation that their time has value and that a well-managed project shouldn't require them to sacrifice weeks of normal life. They've often experienced—or heard about—renovations that spiralled out of control, and they're specifically seeking a contractor who can provide certainty alongside quality.
At All Things Considered, we've built our reputation on delivering exactly this combination. Our approach isn't suitable for every project or every client, but for those seeking a quick kitchen refit in London without compromising on standards, it represents a genuinely better way. We invite you to contact our team to discuss whether your kitchen renovation could benefit from our rapid, disruption-minimising approach.
Frequently Asked Questions
Can you really complete a full kitchen renovation in just 7-10 days?
Yes, we consistently complete comprehensive kitchen renovations within this timeframe for suitable projects. The key is our extensive pre-project planning phase, which takes place four to six weeks before work begins. During this time, we finalise every specification, order all materials, and coordinate our trades so that when we arrive on-site, work proceeds without delays. This approach has been refined over more than a decade and hundreds of successful projects across London.
What types of kitchen projects are suitable for your rapid renovation service?
Our 7-10 day timeline is appropriate for complete kitchen refits that don't involve major structural alterations. This includes replacing units, worktops, appliances, flooring, tiling, and electrical and plumbing modifications within the existing footprint. Projects requiring wall removal, extensions, or changes needing building control approval require longer timelines and are quoted accordingly. During our initial consultation, we'll confirm whether your project suits our rapid approach.
How do you maintain quality while working at this pace?
Speed in our process comes from eliminating wasted time, not from rushing skilled work. We achieve this through meticulous planning, having all materials on-site before work begins, and coordinating trades to work in parallel where appropriate. A dedicated project manager remains on-site throughout, ensuring standards are maintained continuously. Our final inspection covers every detail from cabinet alignment to grout lines, and we only hand over when everything meets our quality standards.
Do you have experience with Victorian and Georgian properties in conservation areas?
Absolutely. A significant proportion of our work is in period properties across Kensington, Chelsea, Notting Hill, and Westminster, many within conservation areas. We understand the particular requirements these buildings present, from working with walls that aren't perfectly straight to protecting original features and complying with local planning sensitivities. This experience actually contributes to our efficiency—we anticipate and prepare for challenges that might surprise less experienced contractors.
What is included in your kitchen renovation quote, and can the price change once work begins?
Our quotes are comprehensive and cover all standard elements: removal and disposal of existing kitchen, electrical work, plumbing, flooring, wall preparation and tiling, unit and worktop installation, appliance fitting, decoration, and final cleaning. We provide fixed pricing that doesn't change barring genuinely unforeseeable circumstances such as hidden structural issues. We're transparent about what's included and, equally importantly, what falls outside our rapid renovation scope.